Construction began with Trench excavation

At last  the construction work of the Examination block began on 8th day of June 2010 with the excation of trenches. The work has not been easy given the hard underlying rockstructure. After an entire week of hard work, much of the excavation work could visibly be seen to be complete.  Thanks to the benefactors and the zealous workers whose efforts will soon be seen visibly in the erection of this block.

Structure ready to be worked out

Cutting the Trenches under the hot sun.

Hands good as machines !

Excavation goes as deep as the a person’s height

Lower side

Advertisements