Construction in Progress

DSC03066The Work on the 2nd floor is progressing well. Below are some of the pictorials.

DSC03064

DSC03067

Construction resumes

St. Konrad Integrated Vocational School is heading for progress. The work on the Examination block has now resumed. It is hoped that by the end of the Year, the examination Block roof will be in Place. Thanks to all the supporters for the assistance.

Examination Block second floor Examination Block second floor[/caption]

DSCN3641

Pfarrer Kurt visits St. Konrad

DSCN3139

 

DSCN3129

 

Pfarrer Kurt on the 6th March this Year came to Uganda. St. Konrad Integrated Vocational School community was very happy to welcome him. During the Assembly to welcome him, the Director thanked all people who support the School. He further thanked the Staff for keeping and improving the School. In the same occasion, a Student called Akankwaasa Sabiiti who had obtained First Grade in Ordinary Level Examinations was given a gift for his excellence and students were challenged to emulate his example. The Director further exhorted the Staff to be perseverant and work very hard despite the low pay they were receiving. Pfarrer Kurt also thanked the community and assured them of the unfailing support for the school. He spent one week in school and students were happy once more to learn some German.