Construction of Permanent Workshops

The Construction of Permanent Workshops for St. Konrad Integrated Vocational Schools has resumed for the first Phase which consists in erecting of three workshops. The Work shall consists of erecting columns and making of the Slab, given the limited funds. St. Konrad Integrated Vocational School is grateful to all people and organisations who are making this work possible.

Erecting Columns

Erecting Columns

dscn2150

 

A Storm hits St. Konrad School

On the 18th of September, it was Sunday Evening. A heavy and windy rain fell, the first of the rains. It became a real storm which unroofed the Workshop for Construction. No other structure was affected. A lot of work followed the next week to ensure that a new temporary structure was set up. Thanks to all people who helped to reroof the workshop.

A part of the roof seen on the ground, another flew off

A part of the roof seen on the ground, another flew off

The Contribution of the Youth from Ottnang

On the 28th August 2016, the Youth of Ottnang met the Director of St. Konrad Integrated Vocational School and handed him a cheque of Euro 750 towards the construction efforts of the School. The Youth from the Ottnang Zone had raised this amount through Football Tornaments. The Director heartily thanked all the Youth who participated to raise this donation. This was not the first time that the Youth of Ottnang contributed to the efforts of the construction of St. Konrad Integrated Vocational School. The handover ceremony took place at the Family of Niedermeier in Ottnang. Thanks to you all  the Youth and Friends for the love of our School.

Donation from Football Tornament

Donation from Football Tornament

Friends of St. Konrad at the Family of Ingrid and Josef Niedermeir

Director with Friends from Ottnang